Industrial & 3-Phase Power
Reliable 400V power supplies and heavy machinery installations designed to eliminate operational downtime.

Engineering Overview & Scope
We install, maintain, and upgrade three-phase electrical supplies for workshops, manufacturing units, warehouses, and logistics hubs across Greater Manchester.
Our qualified electricians handle 400V supplies, busbar trunking, motor control wiring, machine isolators, and high-bay LED lighting. All work is installed and tested to the Electricity at Work Regulations 1989 and BS 7671 standards.
Core Technical Capabilities
Three-Phase 400V Distribution
High-capacity busbar trunking, main switchboards, sub-distribution boards, and balanced phase allocation.
Machinery Hookups & Isolators
Dedicated heavy equipment power supplies, rotary isolators, emergency stop circuits, and interlocking safety relays.
Motor Controls & Automation
Variable Speed Drives (VFDs), soft starters, direct-on-line (DOL) control panels, and automation wiring.
High-Bay Factory Lighting
High-output LED warehouse and factory illumination designed for precision task lighting and energy savings.
Specifications & Compliance Standards
Project Delivery & Quality Process
Industrial Site Survey
Assessment of maximum demand, harmonic distortion, thermal profiling, and existing panel capacity.
Engineering Design & Containment
Sizing high-capacity cables, calculating fault withstand ratings, and routing heavy-duty containment.
Panel Build & Machine Wiring
Installing distribution panels, local machine isolators, interlocking systems, and protective earthing.
Load Balancing & Commissioning
Load balancing across all three phases, earth loop impedance verification, and commissioning under full load.
Service Questions & Answers
What should we do if our machinery repeatedly trips the main breaker?
Frequent tripping usually indicates phase unbalance, inrush current overloads, or harmonic issues. Our industrial electricians perform thermal logging and load studies to identify and resolve root causes immediately.
Can you install machinery supplies during scheduled plant shutdowns?
Yes, our team regularly works during planned holiday shutdowns, overnight shifts, and maintenance windows to ensure zero production loss.
Do you install external power supplies for yard machinery and gantries?
We install weatherproof IP65/IP66 rated supplies, steel wire armoured (SWA) feeds, and underground ducts for external yard equipment.
Get a Free Quote or Site Survey
Our team provides clear, accurate pricing and friendly expert guidance for homes, commercial units, and industrial facilities.
- Company Number: 17534491
- Head Office: 28 Quilter Grove, Manchester, M9 8DE
- Standards: BS 7671 18th Edition & Part P Compliant
- On-Call: 24/7 Emergency Dispatch
Contact Us Now
Get in touch with our Manchester team for a free quote, site survey, or friendly electrical advice.