Electrical Testing & EICR Certification

Fixed wire testing, Electrical Installation Condition Reports (EICR), and certified remedial repairs in Manchester.

Statutory EICR ComplianceElectricity at Work Regs 1989Clear Defect Coding (C1-C3)Manchester & North West
Electrical Testing & EICR Certification

Engineering Overview & Scope

Periodic electrical inspection and testing is required under the Electricity at Work Regulations 1989 and standard commercial insurance policies. We provide thorough EICR testing for commercial facilities, landlords, and homeowners across Greater Manchester.

Our qualified test electricians inspect circuits, panelboards, and earthing bonding to identify degradation and safety hazards. Any defects are clearly classified (C1, C2, C3, FI) with transparent fixed-price quotes for remedial rectification.

Core Technical Capabilities

Fixed Wire Testing & EICR Reports

Rigorous testing of distribution boards, circuits, earthing bonding, and accessories with detailed defect categorization.

Commercial & Industrial Periodic Testing

Scheduled 3-year and 5-year compliance cycles for commercial premises, manufacturing facilities, and hospitality venues.

Thermal Imaging Surveys

Non-invasive infrared diagnostics to identify hot spots, loose terminations, and overloaded busbars before faults develop.

Fast Remedial Rectification

Immediate isolation of dangerous C1/C2 faults and priority quotation/repair to bring unsatisfactory reports up to Satisfactory standard.

Specifications & Compliance Standards

Legal FrameworkElectricity at Work Regulations 1989, Health & Safety at Work Act
Testing ScopeDead tests (continuity, insulation) & Live tests (RCD, loop impedance)
Inspection FrequencyCommercial (5 yrs), Industrial (3 yrs), Domestic Rental (5 yrs)
Reporting FormatDigital NICEIC-aligned certificate with complete schedule of results

Project Delivery & Quality Process

Stage 01

Testing Protocol Agreement

Agreeing sampling percentages, isolating critical IT servers, and scheduling after-hours access if required.

Stage 02

Visual & Physical Inspection

Checking cable conditions, distribution board fire barriers, switchgear wear, and earthing conductor integrity.

Stage 03

Instrument Circuit Testing

Performing calibrated insulation resistance, earth fault loop impedance, and RCD trip-time verification on every circuit.

Stage 04

Report Generation & Rectification

Issuing formal digital EICR documentation with clear classification of any C1, C2, C3, or FI observations and itemised repair options.

Service Questions & Answers

What is the difference between C1, C2, and C3 defect codes on an EICR?

C1 indicates 'Danger Present' requiring immediate action. C2 indicates 'Potentially Dangerous' requiring urgent remedial work. C3 means 'Improvement Recommended' for best practice. A report with any C1 or C2 receives an 'Unsatisfactory' overall rating.

How often does my commercial property legally require an EICR?

Commercial premises typically require testing every 5 years, while industrial installations subject to heavy dust, vibration, or moisture typically require testing every 3 years.

Can testing be conducted outside of normal business hours?

Yes, we regularly conduct commercial and industrial testing overnight or during weekends to avoid disrupting day-to-day operations and computing systems.

Get a Free Quote or Site Survey

Our team provides clear, accurate pricing and friendly expert guidance for homes, commercial units, and industrial facilities.

TAN SERVICES LTDTAN SERVICES LTD
  • Company Number: 17534491
  • Head Office: 28 Quilter Grove, Manchester, M9 8DE
  • Standards: BS 7671 18th Edition & Part P Compliant
  • On-Call: 24/7 Emergency Dispatch

Contact Us Now

Get in touch with our Manchester team for a free quote, site survey, or friendly electrical advice.

28 Quilter Grove, Manchester, M9 8DE