EV Charger Installation

Certified EV charging point installations for commercial fleets, workplaces, and residential properties.

7kW - 22kW Fast ChargingDynamic Load BalancingBS 7671 Section 722Manchester & North West
EV Charger Installation

Engineering Overview & Scope

We install certified EV charging points for workplace car parks, commercial vehicle fleets, and residential properties across Greater Manchester.

We configure Dynamic Load Management (DLM) to balance charging demand against available building capacity, preventing fuse overloads without requiring expensive supply upgrades. All work adheres to BS 7671 Section 722 regulations.

Core Technical Capabilities

Workplace & Commercial Fleet Depots

Multi-socket 22kW fast charging bays with scheduled overnight trickle charging and rapid top-ups.

Dynamic Load Management (DLM)

Intelligent current monitoring that automatically scales EV charging speed based on building power demand, preventing main fuse blowouts.

Back-Office Software & Payment Gateways

Cloud platforms supporting RFID swipe cards, contactless payment terminals, and tariff billing for staff or public drivers.

Home Smart Wallbox Installations

Compact 7.4kW smart home chargers with smart scheduling for cheap off-peak EV tariffs.

Specifications & Compliance Standards

Power Ratings7.4kW single-phase / 22kW 3-phase / 50kW+ DC Rapid
StandardsBS 7671 Section 722 (Electric Vehicle Charging Installations)
ProtectionBuilt-in Type A / Type B RCD and PEN fault detection
ConnectivityOCPP 1.6J/2.0.1 compliant with 4G/Wi-Fi/Ethernet

Project Delivery & Quality Process

Stage 01

Supply Capacity Audit

Measuring incoming main service cutout capacity, maximum demand, and spare capacity in existing distribution boards.

Stage 02

Infrastructure & Groundworks

Planning trenching, ducting, containment, and cable runs from the electrical plant room to charging bays.

Stage 03

Charger Installation & Networking

Bolting pedestals or wall units, terminating SWA power feeds, and establishing secure 4G/Ethernet communication.

Stage 04

PEN Fault Testing & Commissioning

Specialised EVSE verification test sequences, OZEV grant compliance filing, and back-office onboarding.

Service Questions & Answers

What is Dynamic Load Management and why does our business need it?

Dynamic Load Management monitors building power usage in real time. If equipment or machinery causes building demand to spike, the system temporarily reduces EV charging currents to avoid tripping your main company supply.

Do commercial EV chargers require separate three-phase power supplies?

Fast 22kW chargers require a 400V 3-phase connection. Standard 7.4kW chargers operate on standard 230V single-phase. We assess your site and advise on the most cost-effective configuration.

Can we charge staff or the public for electricity used at our charge points?

Yes, our smart commercial chargers support contactless pay-as-you-go terminals, mobile apps, or RFID badges, allowing you to set electricity prices and generate revenue.

Get a Free Quote or Site Survey

Our team provides clear, accurate pricing and friendly expert guidance for homes, commercial units, and industrial facilities.

TAN SERVICES LTDTAN SERVICES LTD
  • Company Number: 17534491
  • Head Office: 28 Quilter Grove, Manchester, M9 8DE
  • Standards: BS 7671 18th Edition & Part P Compliant
  • On-Call: 24/7 Emergency Dispatch

Contact Us Now

Get in touch with our Manchester team for a free quote, site survey, or friendly electrical advice.

28 Quilter Grove, Manchester, M9 8DE